KAPSARC Flagship Project – Turki Al-Utaibi Surveyors

KAPSARC: King Abdullah Petroleum Studies and Research Center

Project Overview

Client: Saudi Aramco

Main Contractor: Drake and Scull International

Turki Al-Utaibi Surveyors at KAPSARC

Turki Al-Utaibi Surveyors, under Drake and Scull International, played a pivotal role in the KAPSARC project. Led by Chief Surveyor Mr. Abdul Rawoof, the team managed 22 survey crews, executing advanced 3D alignment and topographic surveys. Their expertise ensured precision in complex tasks like roof and wall railing system alignments, concrete pouring, and power plant projects, achieving accuracies up to ±1mm.

Key Personnel & Contributions

Mr. Abdul Rawoof – Chief Surveyor
Led 22 survey crews, pioneered advanced survey methods, and resolved on-site challenges with precision.
Mr. Muhammed Ihtesham – Assistant Chief Surveyor
Expert in site work and drafting, solved complex survey issues, and contributed from the project’s start.
Mr. Syed Khaja Afzal Hussain – Senior Surveyor
Specialized in 3D alignment of roof railing systems with high accuracy.
Mr. Shaik Ghouseuddin – Senior Surveyor
Experienced in 3D alignment for roof railing systems at KAPSARC.
Mr. Awais Kharne –Senior Surveyor
Managed fixpoints and wall railing system alignment for RCT building.

Special Surveying Tasks

  • 3D alignment of roof and wall railing systems with ±1mm precision.
  • Setting out reference elevations for concrete pouring of slabs, walls, and columns.
  • Topographic surveys for Arafat and road extension projects using GPS.
  • Mechanical survey works for power plant projects (PP-10, PP-11).
KACWC Flagship Project – Turki Al-Utaibi Surveyors

KACWC (King Abdul Aziz Center for World Culture) Dhahran

Project Overview

Client: Saudi Aramco

Main Contractor: Saudi Oger

Turki Al-Utaibi Surveyors at Ithra (K.A.C.W.C)

The Turki Al-Utaibi Surveyors operated under the guidance of Saudi Oger Company. The survey department was led by Chief Surveyor Mr. Mohammed Ali Baba. Turki Al-Utaibi Company was assigned comprehensive surveying responsibilities across key zones like the Tower, Auditorium, Keystone, Plaza, Library, and External Works.

Nearly ten survey crews operated under the supervision of Senior Surveyor Mr. S.K. Afzal Hussain.

Key Personnel & Contributions

Mr. Syed Khaja Afzal Hussain – Senior Surveyor
Expert in critical area 3D alignment of GRC panels.
Used advanced survey software for 3D setting out with precision up to +/-1mm.
Mr. Imtiyaz Khan – GPS Surveyor
Handled external works: roads, pathways, manholes, light poles, pipelines under Mr. Jerry Ugat (Saudi Oger).
Mr. Shaik Ghouseuddin –Senior Surveyor
Oversaw Auditorium works: steel alignment, gypsum wall, and panel layout.
Mr. Mohammed Abdul Nayeem –Senior Surveyor
Managed Plaza zone: layout of cladding, gypsum, and secondary steel work.
Mr. Mr. Mohd Zakir – Senior Surveyor
Worked in Children’s Oasis under Mr. Rolan Tordecilla (Saudi Oger).

Special Surveying Tasks

  • 3D alignment of GRC panels with precision tools.
  • Laying out supporting brackets on main steel beams at the tower roof.
  • Steel alignment, gypsum wall layout, and panel positioning in critical internal zones.

Onsite Team

Shuqaiq Steam Power Plant Project – Turki Al-Othaibi Surveyors

Shuqaiq Steam Power Plant

Project Overview

Client: Saudi Electricity Company (SEC)

Main Contractor: Hyundai Heavy Industries

Capacity: 2,640MW heavy oil-fired supercritical pressure thermal power plant

Contract: $3.3 billion, signed August 4, 2013, completed by 2017

Turki Al-Othaibi Surveyors at Shuqaiq

Turki Al-Othaibi Surveyors served as consultants for Hyundai Heavy Industries on the Shuqaiq Steam Power Plant project. Led by Senior Surveyors Mr. Mohammed Saleem and Mr. Mohd Awais, a team of approximately 20 surveyors conducted joint surveys and quality checks for subcontractors. Using advanced GPS and precision tools, they ensured tolerances were met, contributing to the project’s structural integrity and timely completion. Their expertise in site layout, foundation alignment, and infrastructure surveys was critical to the success of this 2,640MW power plant on Saudi Arabia’s Red Sea coast.

Key Personnel & Contributions

Mr. Mohammed Saleem – Senior Surveyor
Led survey operations, specializing in GPS surveys for site layout and quality control.
Mr. Mohd Awais – Senior Surveyor
Supervised joint surveys and quality checks for subcontractor work, ensuring precision.
Mr. Syed Rashad – Surveyor
Checked subcontractor work, ensuring compliance with tolerance standards.
Surveyor – Surveyor
Contributed to foundation and structural surveys for the power plant.
Surveyor – Surveyor
Supported infrastructure and equipment installation surveys.

Special Surveying Tasks

  • GPS surveys for accurate site layout and alignment.
  • Quality control of subcontractor work, ensuring tolerance compliance.
  • Foundation and structural steel alignment for power plant stability.
  • Topographic and infrastructure surveys for roads and utilities.